Greenamp solar install in Sturgeon County farm, 2023: 15.4 kW ground mount

Our installs · Sturgeon County

Solar installations in Sturgeon County

Real Greenamp systems on Sturgeon County farms and acreages. Every one installed by our own Red Seal electricians.

No pressure. If solar isn't right for your home, we'll tell you.

Sturgeon County farm · 2023

Our work in Sturgeon County

See our work before you get a quote

Most people want to see real installs before they choose an installer. This page shows a selection of our Sturgeon County jobs. Every photo is a Greenamp job, taken on site.

Out here, the best spot is often open ground near the yard, or the roof of the house or a shop. We build both with our own crew. We pull the permits and send the utility application.

Featured jobs

A closer look

The details on some of our Sturgeon County jobs.

Greenamp solar install in Sturgeon County farm, 2023: 15.4 kW ground mountGreenamp solar install in Sturgeon County farm, 2023: 15.4 kW ground mountGreenamp solar install in Sturgeon County farm, 2023: 15.4 kW ground mount

Sturgeon County farm · 2023

Ground mount beside the field

A 15.4 kW ground mount on open grass beside the crop.

15.4 kW

system size

Ground

mount

2023

installed

Greenamp solar install in Sturgeon County acreage, 2026: 13.5 kW · 30 panels · metal roofGreenamp solar install in Sturgeon County acreage, 2026: 13.5 kW · 30 panels · metal roofGreenamp solar install in Sturgeon County acreage, 2026: 13.5 kW · 30 panels · metal roof

Sturgeon County · 2026

30 panels on a metal roof

A 13.5 kW system on an acreage home with a metal roof.

13.5 kW

system size

30

panels

2026

installed

Greenamp solar install in Sturgeon County acreage, 2026: panels on the roof of a home (15 kW · 30 panels)Greenamp solar install in Sturgeon County acreage, 2026: panels on the roof of a home (15 kW · 30 panels)Greenamp solar install in Sturgeon County acreage, 2026: panels on the roof of a home (15 kW · 30 panels)

Sturgeon County · 2026

A 15 kW acreage home

30 panels across several faces of the house roof.

15 kW

system size

30

panels

2026

installed

Greenamp solar install in Sturgeon County, 2023: 10 kW ground mount · LONGi panelsGreenamp solar install in Sturgeon County, 2023: 10 kW ground mount · LONGi panelsGreenamp solar install in Sturgeon County, 2023: 10 kW ground mount · LONGi panels

Sturgeon County · 2023

A 10 kW ground mount

A ground mount with LONGi panels. The racking and the disconnect are in the photos below.

10 kW

system size

Ground

mount

2023

installed

Photo gallery

More Sturgeon County installs

A selection of our Sturgeon County installs. Tap a photo to see it bigger. Pick a year to see the work from that year.

Greenamp solar install in Sturgeon County acreage, 2026: panels on the roof of a home (15 kW · 30 panels)
Sturgeon County acreage · 202615 kW · 30 panels
Greenamp solar install in Sturgeon County acreage, 2026: 13.64 kW ground mount · 22 panels
Sturgeon County acreage · 202613.64 kW ground mount · 22 panels
Greenamp solar install in Sturgeon County acreage, 2026: 13.64 kW ground mount · 22 panels
Sturgeon County acreage · 202613.64 kW ground mount · 22 panels
Greenamp solar install in Sturgeon County acreage, 2026: 13.5 kW · 30 panels · metal roof
Sturgeon County acreage · 202613.5 kW · 30 panels · metal roof
Greenamp solar install in Sturgeon County acreage, 2026: 13.5 kW · 30 panels · metal roof
Sturgeon County acreage · 202613.5 kW · 30 panels · metal roof
Greenamp solar install in Sturgeon County acreage, 2026: 13.5 kW · 30 panels · metal roof
Sturgeon County acreage · 202613.5 kW · 30 panels · metal roof
Greenamp solar install on an acreage in Sturgeon County, 2026: 26 panels on a building roof (11.7 kW)
Sturgeon County acreage · 202611.7 kW · 26 panels
Greenamp solar install on an acreage in Sturgeon County, 2026: 26 panels on a building roof (11.7 kW)
Sturgeon County acreage · 202611.7 kW · 26 panels
Greenamp solar install in Sturgeon County, 2026: ground mount
Sturgeon County · 2026Ground mount
Greenamp solar install in Sturgeon County, 2026: ground mount
Sturgeon County · 2026Ground mount
Greenamp solar install in Sturgeon County, 2026: ground mount
Sturgeon County · 2026Ground mount
Greenamp solar install in Sturgeon County farm, 2023: 15.4 kW ground mount
Sturgeon County farm · 202315.4 kW ground mount
Greenamp solar install in Sturgeon County farm, 2023: 15.4 kW ground mount
Sturgeon County farm · 202315.4 kW ground mount
Greenamp solar install in Sturgeon County, 2023: 10 kW ground mount · LONGi panels
Sturgeon County · 202310 kW ground mount · LONGi panels

How we work

How we do the work

The photos show the finished job. Here is what goes into each one.

  • Our own Red Seal electricians and apprentices do every install, with a Master Electrician on site. Screw piles for ground mounts are the one outside trade, arranged as part of the job.
  • We run wiring through the attic where we can. Outside runs go in conduit.
  • We pull the electrical permit and send the utility application for you.
  • Your quote lists every part. What we quote is what you pay.
  • Our residential workmanship warranty is 10 years. It moves to the new owner if you sell.
Greenamp ground mount racking before the panels go on, Sturgeon County, 2023
Ground mount racking before the panels go on, Sturgeon County · 2023
Disconnect and wiring under a Greenamp ground mount, Sturgeon County, 2023
The disconnect under a ground mount, Sturgeon County · 2023

Customer reviews

What our customers say

Greenamp was amazing! They were patient, answered all my questions, completed all permit applications and assisted me with my CEIP applications. Tom was supportive throughout the entire process.
Lindsay | Sturgeon County, ABGoogle review
They are very professional, clean installs, didn’t leave any garbage behind. Alex and Tom are very knowledgeable. I Would recommend these guys.
Harley and Austin | Sturgeon County, ABGoogle review
From the beginning it was clear that Alex and the team was a great choice to help us get set up with a solar system on our acreage.
Chantelle | Sturgeon County, ABGoogle review

Questions

Questions about our Sturgeon County installs

Still have a question? Call (780) 770-9907.

Are these real Greenamp installs?

Yes. Every photo on this page is a Greenamp job in Sturgeon County, taken on site. No stock photos and no renderings.

Who owns the power lines in Sturgeon County?

Usually FortisAlberta. In some rural areas, the lines belong to a rural electrification association. That changes who reviews your application and who changes your meter. We send the application either way.

Roof, shop or ground mount: which is best on an acreage?

Shop and barn roofs are often the lowest cost spot, if they face south, east or west and have plenty of life left. A ground mount costs more, but we can set the angle for winter sun and snow. We can price both so you can compare.

Who does the install?

Our own crew. Red Seal electricians and apprentices do the work, with a Master Electrician on site. Screw piles for ground mounts are the one outside trade. We arrange them as part of the job.

When do you install?

Most of our installs happen from early spring to late fall. Some roof installs go ahead in winter, depending on the weather, the snow load and site conditions. Ground mounts wait for spring, because screw piles can't go into frozen ground. The site visit and design can still happen in winter.

What permits does an install need?

We pull the electrical permit before work starts. We also send the utility the micro generation application. After the inspection passes, the utility puts in a meter that measures power both ways.

Power Your Future with Clean Solar

Want a system like these on your roof? Get a free quote. It lists the panel model, the inverter and the panel count, the same details you see on this page.